Yard investments
40 yard investments, $16.8B disclosed.
Dry docks, assembly halls, and expansions at public and private yards. Costs are left blank where sources disagree.
| Project | Yard | Cost | Funding | Status | Target |
|---|---|---|---|---|---|
| $5 billion yard expansion (new docks, quays, block assembly) | Hanwha Philly Shipyard | $5B | company | Announced | — |
| Dry Dock 5 (replacement of Dry Dock 3) | Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility | $3.4B | Navy SIOP | Under construction | 2028 |
| Port Alpha greenfield shipyard | Brownsville, TX | $3B | company | Announced | 2028 |
| Multi-Mission Dry Dock (Dry Dock 1 North and West extension) | Portsmouth Naval Shipyard | $1.7B | Navy SIOP | Under construction | 2028 |
| Gulf Copper shipyards modernization (American icebreaker factory) | Gulf Copper Galveston | $1B | company | Under construction | 2028 |
| South Yard Assembly Building (SYAB) completion contract | Electric Boat Groton Shipyard | $544M | company | — | |
| Dry Dock 3 modernization (MILCON P1062) | Norfolk Naval Shipyard | $442.1M | Navy SIOP | Under construction | 2031 |
| Dry Dock 4 seismic upgrade (next phase) | Puget Sound Naval Shipyard & Intermediate Maintenance Facility | $377.7M | Navy SIOP | Under construction | — |
| Franklin shipyard expansion for Marauder autonomous vessels | Franklin, LA | $300M | company | Under construction | 2027 |
| Shiplift and land-level repair complex | BAE Systems Jacksonville Ship Repair | $250M | company | 2025 | |
| River Port shiplift and production expansion | Newport News, VA | $180M | mixed | Announced | 2028 |
| Electrical substation replacement | Puget Sound Naval Shipyard & Intermediate Maintenance Facility | $145M | Navy SIOP | Under construction | 2029 |
| Dry Dock 4 refueling complex | Norfolk Naval Shipyard | $112.5M | Navy SIOP | Under construction | 2025 |
| Steel shipbuilding facility and panel line | Austal USA Mobile Shipyard | $100M | mixed | — | |
| Berths 40/41 repairs and Dry Dock 8 upgrade for Ford-class carriers | Norfolk Naval Shipyard | $91.5M | Navy SIOP | Under construction | — |
| Drydock #4 (25,000-ton floating dry dock) | Colonna's Shipyard | $79M | company | Announced | 2028 |
| Pier Support Center | Bath Iron Works | $40M | mixed | — | |
| Dry dock upgrades for Navy MIL-STD-1625D certification | Vallejo, CA | $13M | company | Announced | — |
| 130-ton telescopic boom crane (FY2025 Small Shipyard Grant) | Fraser Shipyards | — | MARAD grant | Announced | — |
| 160-ton rough terrain mobile crane (FY2025 Small Shipyard Grant) | Chesapeake Shipbuilding | — | MARAD grant | Announced | — |
| 200-ton marine travelift (FY2025 Small Shipyard Grant) | New Iberia, LA | — | MARAD grant | Announced | — |
| A.W. Hendry dry dock strengthening (FY2024 Small Shipyard Grant) | Gulf Marine Repair | — | MARAD grant | Announced | — |
| Acquisition and conversion of W International module plant | Goose Creek, SC | — | company | 2028 | |
| Atlas floating dry dock for Columbia-class | Electric Boat Groton Shipyard | — | company | — | |
| Automated welding system (FY2024 Small Shipyard Grant) | Alabama Shipyard | — | MARAD grant | Announced | — |
| Blast and paint facility | Fincantieri Marinette Marine | — | company | — | |
| Building 34 frigate erection hall | Fincantieri Marinette Marine | — | company | — | |
| Building 35 steel processing building and automated panel line | Fincantieri Marinette Marine | — | company | — | |
| Building 9C (final phase of 9-series building) | Electric Boat Quonset Point Facility | — | company | Under construction | 2024 |
| Crystal Mall conversion to engineering and training campus | Waterford, CT | — | company | Under construction | 2027 |
| Final Assembly Building 2 and shiplift | Austal USA Mobile Shipyard | — | company | Under construction | 2026 |
| Mobile Naval Yard submarine module industrial park | Alabama Shipyard | — | mixed | Announced | — |
| Module Manufacturing Facility 3 (MMF3) for submarine modules | Austal USA Mobile Shipyard | — | SIB | Under construction | 2026 |
| Multi-Class Submarine Production Facility | Newport News Shipbuilding | — | mixed | Under construction | — |
| Multimission Dry Dock (Dry Dock 3 / Piers 6-7 footprint) | Puget Sound Naval Shipyard & Intermediate Maintenance Facility | — | Navy SIOP | Announced | — |
| Nelson Street infrastructure improvements, Phase II | Eastern Shipbuilding Nelson Street Yard | — | company | Under construction | 2025 |
| Pascagoula production line addition | Ingalls Shipbuilding | — | company | Announced | — |
| Polar Security Cutter production integration and land-based test facilities | Bollinger Mississippi Shipbuilding | — | mixed | Announced | 2027 |
| Replacement floating dry dock (35,000-ton) | General Dynamics NASSCO San Diego | — | company | Under construction | 2026 |
| San Diego waterfront ship repair facility and floating dry dock | Austal USA San Diego Ship Repair | — | company | 2023 |